View: CR/DR Note Distribute Proration

RotoID: PO0319

Protocol: Superview
DLL:POCRNK

Compositions: 2

RotoID Tables Title DLL

PO0320 POCRNS CR/DR Note Additional Costs POCRNS
PO0326 POCRND CR/DR Note Cost Distributions POCRND

Keys: 1

Title Fields

Line Sequence LREV

Fields: 15

Field Index Type Title Attributes Presentation

LREV 1 BCD*10.0 Line Revision E A K R 
CONTRACT 2 String*16 Contract A  Mask: %-16C
PROJECT 3 String*16 Project A  Mask: %-16N
CCATEGORY 4 String*16 (Cost) Category A  Mask: %-16N
COSTCLASS 5 Integer Cost Class A  List:7 entries
0 =
1 = Labor
2 = Material
3 = Equipment
4 = Subcontractor
5 = Overhead
6 = Miscellaneous
ITEMNO 6 String*24 Item Number A P  Mask: %-24C
ITEMDESC 7 String*60 Item Description A 
AMOUNT 8 BCD*10.3 Amount E A X 
BILLTYPE 9 Integer Billing Type A P  List:4 entries
0 =
1 = Non-billable
2 = Billable
3 = No Charge
BILLRATE 10 BCD*10.6 Billing Rate E A X 
BILLCURR 11 String*3 Billing Currency A  Mask: %-3N
ARITEMNO 12 String*16 A/R Item Number A  Mask: %-16C
ARUNIT 13 String*10 A/R Unit of Measure A  Mask: %-10C
PROJTYPE 14 Integer Project Type A  List:4 entries
0 =
1 = Time and Materials
2 = Fixed Price
3 = Cost Plus
REVREC 15 Integer Accounting Method A  List:9 entries
0 =
1 = Completed Project
2 = Total Cost Percentage Complete
3 = Labor Hours Percentage Complete
4 = Billings and Costs
5 = Project Percentage Complete
6 = Category Percentage Complete
7 = Completed Contract
8 = Accrual-Basis